Dry port – Port of Dieppe

Project challenge

The Port of Dieppe wanted to adapt its infrastructure to meet the expectations of pleasure boaters, but also to free up the space needed in the yachting basin to develop new activities.

Solution implemented

ACG has designed an automated lifting system that allows boats to be stored and launched quickly and safely:

An automated trolley on rails, capable of transporting boats from their storage location to the dock without manual intervention;

A precise and secure gripping system, avoiding any risk of damage to the hull or engine;

Synchronisation with bookings and schedules, enabling boaters to collect their boats in less time;

Optimised for continuous use, guaranteeing smooth launching even during busy periods.

This solution improves flow management, optimises port operations and offers users a fast, reliable service, reducing waiting times and increasing boat availability.

You may also be interested in these achievements

Dry port

Boating

Lorient dry port

Read more